Jiangan Ten Bridge上层建筑的高架结构已经开始,公
发布时间:2025-09-09 11:45
Rendering Jianghan Ten Bridges photo provided by Correspondent Chutian Metropolis Daily Jimu News (Reporter Ma Qingni, Correspondent Hu Mengling, Duan Guorui) on September 4, with a smooth assembly of leading beam reduction at the construction site, the leading reduction of construction of Jangan's main jangan ten The cross-strait project implemented by the AVIC Group under the Wahangan Chengfa Group that offically kicked,将项目的构造标记为关键阶段,并为主桥的主桥的平稳穿越奠定了坚实的基础。 Jiangan Ten Bridge和跨界接线项目是武汉市的主要交通项目。它的总长度约为4,123米。这是连接Caidian,Hanyang和Qiaokou的重要跨河河道。完成后,这将是通往汉河的一座pangrandmark桥。 ang pangunahing proyekto ng tulay ng proyekto ay nagpatibay ng isang 380-metro na mas mas mababang pagdadalng simpleng bakal na kahon ng篮子ng bakal na arko na may isang 82.5-米特罗 - 马塔斯na arlow,在angunaing pangunahing sinag sinag ay dinisenyo bilang iStruktura istruktura ng bilain ng box Linya sa Parehong Mga Direksyon,NA May Kabuuang Timbang NA Halos 9,800吨。在施工过程中,主桥采用了“首先和之后”的施工过程:采用梁的钢盒悬垂施工,肋骨的拱形在横梁支架下组装并在该区域抬高。台阶高架驱动器的最大长度为120米,分为34个细分市场。架空光束组件标志着实施Arch Bridge上层建筑的项目的正式进入。完成该项目后,它将有效地优化武汉的交叉河流交通方式,改善Qiaokou和Huangjinkou地区的旅行条件,减轻主要交通区域和新城市地区,推动地面发展并升级该路线的工业发展,这对于改善汉江湾地区的距离很重要。武汉的运输。